Line 3: Line 3:
 ===== Weekly Report ===== ===== Weekly Report =====
 ==== 1st Week Report: 20/02/2017-24/02/2017 ==== ==== 1st Week Report: 20/02/2017-24/02/2017 ====
-Teambuilding and choosing project subject. We were informed of all the different subjects and we chose the subject together. We got our second choice, which we are glad with.+Team building and choosing project subject. We were informed of all the different subjects and we chose the subject together. We got our second choice, which we are glad with.
  
 ==== 2nd Week Report: 27/02/2017-03/03/2017 ==== ==== 2nd Week Report: 27/02/2017-03/03/2017 ====
Line 13: Line 13:
 We divided the different purposes between the five of us to do research. Next week we are going to discuss this and definitely choose the purpose of our project. We divided the different purposes between the five of us to do research. Next week we are going to discuss this and definitely choose the purpose of our project.
  
-==== 3th Week Report: 06/03/2017-10/03/2017 ====+==== 3rd Week Report: 06/03/2017-10/03/2017 ====
  
 We chose the purpose of our project and we all agreed on the distiller, but on the meeting we were discussing the purpose and the coordinators said that we have to focus on the mirror itself.  We chose the purpose of our project and we all agreed on the distiller, but on the meeting we were discussing the purpose and the coordinators said that we have to focus on the mirror itself. 
Line 56: Line 56:
 We continued to refine the wiki page. We continued to refine the wiki page.
  
-We started the powerpoint presentation for the interim presentation.+We started the PowerPoint presentation for the interim presentation.
  
 We put the wiki page into a word document. We put the wiki page into a word document.
 ==== 8th Week Report: 18/04/2017-21/04/2017 ==== ==== 8th Week Report: 18/04/2017-21/04/2017 ====
  
-We prepared our interim presentation, we practised the presentation several times in group.+We prepared our interim presentation, we practiced the presentation several times in group.
  
 We did the interim presentation and got feedback. We did the interim presentation and got feedback.
  
 We made the final list of required materials for the project. We made the final list of required materials for the project.
-==== 9th Week Report: 24/04/2017-28/04/2017 ====+==== 9th Week Report: 24/04/2017-28/04/2017 ====
  
 We finished the final list of required materials for the project. We finished the final list of required materials for the project.
Line 81: Line 81:
 ==== 12th Week Report: 15/05/2017-19/05/2017 ==== ==== 12th Week Report: 15/05/2017-19/05/2017 ====
  
-==== 13th Week Report: 22/04/2017-25/04/2017 ====+Some initial testing began as many of the components arrived.
  
 +==== 13th Week Report: 22/05/2017-25/05/2017 ====
  
 +The team participated in a design thinking workshop held over two days with Professor Grazyna Budzinska from the Lodz University of Technology. Work also began on the construction of the prototype with the team being granted access to the workshop.
 +
 +==== 14th Week Report: 29/05/2017-02/06/2017 ====
 +
 +Construction of the prototype continued in the workshop - this included the creation of the base for the mirror as well as supporting structures and welding. Testing continued of the electronic elements of the prototype with this part of the construction nearing completion. Some test results were uploaded to the wiki. The scientific poster was refined based on the feedback the team received. Work began on the user manual for the prototype. Work also began on the video required as part of the project. The team uploaded to the wiki the team agreement that was signed by each member in the early stages of the project.
 +
 +==== 15th Week Report: 05/06/2017-09/06/2017 ====
 +
 +Work continued on the construction of the prototype with the team receiving the 3D printed parts. The team also received some feedback on the paper and began to edit the paper accordingly. The team received feedback also for the sustainability section of the report. The team attended a revision class for the Portuguese lessons to prepare for the test on Monday.
  
  
Line 132: Line 142:
  
  
-==== 3d Meeting (2017-03-09) ====+==== 3rd Meeting (2017-03-09) ====
 === Agenda: === === Agenda: ===
  
Line 149: Line 159:
 1. It was said at the meeting by the lecturers that it is not for them to decide the purpose of the solar mirror. However, they made some suggestions about the water distillation proposal. We were advised to consider the materials we would use. We would have to find materials capable of withstanding the extreme temperatures that concentrated solar radiation produces. We were also advised to think further about the water collection system. It was implied that perhaps the water distillation proposal was not the right way to go. 1. It was said at the meeting by the lecturers that it is not for them to decide the purpose of the solar mirror. However, they made some suggestions about the water distillation proposal. We were advised to consider the materials we would use. We would have to find materials capable of withstanding the extreme temperatures that concentrated solar radiation produces. We were also advised to think further about the water collection system. It was implied that perhaps the water distillation proposal was not the right way to go.
  
-2. If we were to buy materials on our own, we would not be reimbursed. All materials purchased should be purchased with pre authorisation from the team of lecturers. The companies that we purchase materials from must be vetted by the university to ensure they are operating in a proper manner. The authorisation process can take around 1.5 weeks. We must be able to justify the materials we are ordering and must carry out a comparative analysis of other materials.+2. If we were to buy materials on our own, we would not be reimbursed. All materials purchased should be purchased with pre-authorisation from the team of lecturers. The companies that we purchase materials from must be vetted by the university to ensure they are operating in a proper manner. The authorisation process can take around 1.5 weeks. We must be able to justify the materials we are ordering and must carry out a comparative analysis of other materials.
  
 3. We can request materials before the deadline but again, we must adhere to the aforementioned conditions. 3. We can request materials before the deadline but again, we must adhere to the aforementioned conditions.
Line 218: Line 228:
 === Minutes === === Minutes ===
  
-1. There are multiple labs at ISEP. Regarding the mechanical laboratory the schedule will be set when the materials are purchased. There will be a supervisor, but after being shown how the tools work we will have to do everything ourselfs. Appropriate clothing is necessary.+1. There are multiple labs at ISEP. Regarding the mechanical laboratory the schedule will be set when the materials are purchased. There will be a supervisor, but after being shown how the tools work we will have to do everything ourselves. Appropriate clothing is necessary.
  
 2. Welding is available except of aluminum welding. 2. Welding is available except of aluminum welding.
  
-3. We should build a new cardboard model using less tape. The general idea is ok.+3. We should build a new cardboard model using less tape. The general idea is OK.
  
 4. Detailed CAD model and schematics of the control system. 4. Detailed CAD model and schematics of the control system.
Line 268: Line 278:
 4. The interim presentation need to last not more than 15 minutes. 4. The interim presentation need to last not more than 15 minutes.
  
-5. Finally, due to the provisional nature of the report, a pdf version can be delivered, obtained directly from the report page.+5. Finally, due to the provisional nature of the report, a PDF version can be delivered, obtained directly from the report page.
 ==== 7th Meeting (2017-04-06) ==== ==== 7th Meeting (2017-04-06) ====
 === Agenda: === === Agenda: ===
Line 276: Line 286:
 2. How do we put the references from the appendices to the bibliography?  2. How do we put the references from the appendices to the bibliography? 
  
-3. Can we change the presentation from the one we upload to the one we do on the 20th of april?+3. Can we change the presentation from the one we upload to the one we do on the 20th of April?
  
 4. Can we go with Fernando to the lab, to see which materials are available? 4. Can we go with Fernando to the lab, to see which materials are available?
Line 286: Line 296:
 2. For some strange reason our references our put under appendices and not under bibliography. We weren't able to fix it yet. 2. For some strange reason our references our put under appendices and not under bibliography. We weren't able to fix it yet.
  
-3. We can not change it anymore, but we only have to hand in the presentation before the 16th of april and not the 9th of april as said at first.+3. We can not change it anymore, but we only have to hand in the presentation before the 16th of April and not the 9th of April as said at first.
  
 4. We went to the lab with Fernando and looked at the different materials we could use and also the machines that where at our disposal. 4. We went to the lab with Fernando and looked at the different materials we could use and also the machines that where at our disposal.
Line 344: Line 354:
 2. Next Monday we may get the schedule. 2. Next Monday we may get the schedule.
  
-3. No!+3. No.
  
 We need to provide a list of the materials that we need from ISEP. We need to provide a list of the materials that we need from ISEP.
-===== Activities ===== 
  
 +==== 11th Meeting (2017-05-25) ====
 +=== Agenda: ===
 +
 +1. Can you provide us with a workshop schedule in order for us to proceed with the construction of the prototype?
 +
 +=== Minutes: ===
 +
 +The team were informed that the workshop schedule would be emailed in due course, the team also received a multiple voltage power supply.
 +
 +==== 12th Meeting (2017-06-01) ====
 +=== Agenda: ===
 +
 +1. Can you provide us with some information about the final presentation, how long should the presentation last and what information should the team include?
 +
 +=== Minutes: ===
 +
 +The team were informed that the presentation should last 15 minutes and the team were also informed about which information the presentation should include as well as the structure of the presentation. In other matters the team were provided with a different real time clock and also a light sensor in order to aid them in the construction of the prototype.
 +
 +==== 13th Meeting (2017-06-08) ====
 +=== Agenda: ===
 +
 +1. what should the manual contain?
 +
 +2. We asked for 3D filament, but instead of it we get the pieces directly printed from ISEP. Can u tell us, approximately, the cost of each piece? Or at least of all of them?
 +
 +3. Some of the components of the list that we bought, we won't use. As the final report is concerned, which components should appear on the material list?
 +
 +=== Minutes: ===
 +1. Like a normal user manual. The user should understand how the product works, and help if the product doesn't work. We can decide the size of the manual. 
 +
 +2. Don't know yet but they will tell us when they know.
 +
 +3. Update the material list with everything.
 +
 +In the conclusion part in the paper we should include feedback of the process of EPS, how do we proceed the process, our prospective. 
 +
 +In the test report we need to include everything, like weather conditions etc. 
 +
 +==== 14th Meeting  (2017-06-14) ====
 +
 +
 +
 +=== Agenda: ===
 +
 +1. Can you Provide us with an adjustable spanner and allen key for use in the classroom?
 +
 +2. Can we make a separate document for the structural drawings and provide a link to it in the report as there are over 30 drawings?
 +
 +3. Is it possible to reprint one of the 3D pieces?
 +===== Activities =====
 ^ Start      ^ End       ^ Task          ^Description ^  Who^ ^ Start      ^ End       ^ Task          ^Description ^  Who^
 |27/02/17  |03/03/17  |Gantt Chart  |Complete Project Gantt Chart  |José (All)  | |27/02/17  |03/03/17  |Gantt Chart  |Complete Project Gantt Chart  |José (All)  |
 |27/02/17 |13/03/17  |Structural Drafts  | Create and Upload Structural Drafts of Solar Mirror |José/Jan (All)   | |27/02/17 |13/03/17  |Structural Drafts  | Create and Upload Structural Drafts of Solar Mirror |José/Jan (All)   |
 |27/02/17 |13/03/17   |Black Box Diagram | Create and Upload Black Box Diagram of System | Raymond (All) | |27/02/17 |13/03/17   |Black Box Diagram | Create and Upload Black Box Diagram of System | Raymond (All) |