EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2017/03/28 10:48] – [Sponsor] team3start [2017/05/31 18:03] (current) – [Project Summary] team3
Line 1: Line 1:
-===== Self-oriented Solar Mirror ===== +===== Self-Oriented Solar Mirror ===== 
- +{{ :logo2.jpg?200 |}}
- +
-{{ ::17548846_10211194565554418_699926406_o_copy.png?600 |}}+
 ===== Sponsor ===== ===== Sponsor =====
 +<WRAP left>
 {{ ::19893.jpg?200 |}} {{ ::19893.jpg?200 |}}
 +</WRAP>
 ===== Project Summary ===== ===== Project Summary =====
-The goal is to ... 
  
 The project requirements are: The project requirements are:
-  - ... (//specify here your project requirements//); 
   - Comply with the following EU Directives:   - Comply with the following EU Directives:
     - Machine Directive ([[http://ec.europa.eu/growth/sectors/mechanical-engineering/machinery/index_en.htm|2006/42/CE 2006-05-17]]);     - Machine Directive ([[http://ec.europa.eu/growth/sectors/mechanical-engineering/machinery/index_en.htm|2006/42/CE 2006-05-17]]);
Line 25: Line 22:
 **Institution**: Instituto Superior de Engenharia do Porto **Institution**: Instituto Superior de Engenharia do Porto
  
-**Team N. 3**: Senhor Árvore+**Team N. 3**: Senhora Árvore
  
 **Students**: **Students**:
QR Code
QR Code start (generated for current page)